Project Snapshot
Project type: Industrial facility
Location: United Kingdom
Client type: EPC / Consultant
Project phase: Design + Construction
BIM services: Model federation, multidisciplinary coordination, information management
Disciplines: Architecture, Structure, MEP
Software: Revit, Navisworks, ACC, Tekla Structures
The Challenge
- The project involved multiple work packages progressing in parallel.
- Inconsistent information delivery increased the risk of coordination delays and rework.
- Strict compliance with UK ISO 19650 requirements was mandatory.
- The client needed BIM to support clear approvals and controlled information flow.
Our BIM Approach
- Established an ISO 19650–compliant BIM Execution Plan covering all disciplines and packages.
- Federated models into a single coordination environment to LOD 300–350.
- Introduced clash KPIs and design stage gates to manage coordination progress.
- Maintained structured information exchange through ACC to ensure version and data control.
- Supported the project team with construction-ready BIM packs.
Results & Impact
- Faster design approvals through consistent, reliable BIM information.
- Reduced coordination friction between packages.
- Improved clarity and confidence for construction teams.
- Better control over information quality across the project lifecycle.
Value Delivered
- Acted as a UK industrial BIM partner with strong information management capability.
- Reduced program risk through structured coordination governance.
- Enabled smoother progression from design into construction.
- Demonstrated expertise in delivering ISO 19650–compliant BIM at scale.




