Project Snapshot
Project type: Industrial facility
Location: USA
Client type: Manufacturer / EPC
Project phase: Design + Construction
BIM services: Process and utilities BIM modelling, coordination support
Disciplines: Structure, MEP, Process
Software: Revit, Navisworks, ACC, Tekla Structures
The Challenge
- The facility included complex process lines and utility systems with tight routing constraints.
- Coordination errors risked costly field reroutes and production delays.
- Limited tolerance for shutdowns or late design changes.
- The client required BIM to support accurate routing and constructability from the outset.
Our BIM Approach
- Developed coordinated LOD 300–400 BIM models covering process, utility, and supporting systems.
- Applied zone-based control and process-specific coordination rules to manage complex routing.
- Conducted bi-weekly access and constructability reviews to validate installation feasibility.
- Supported fabrication and installation through isometric and spool-level BIM outputs.
- Maintained close collaboration with EPC and process engineers throughout delivery.
Results & Impact
- Resolved routing conflicts before installation.
- Reduced field reroutes and on-site modifications.
- Improved installation efficiency for process and utility systems.
- Supported reliable delivery of a production-critical facility.
Value Delivered
- Delivered industrial BIM expertise tailored to process-driven environments.
- Reduced construction and commissioning risk.
- Enabled predictable installation through coordinated routing.
- Demonstrated capability in managing high-complexity industrial BIM coordination.