Project Snapshot
Project type: Data Center
Location: Ireland
Client type: Consultant
Project phase: Construction + Closeout
BIM services: Design-assist BIM, coordination support, record and handover BIM
Disciplines: Architecture, Structure, MEPF
Software: Revit, Navisworks, ACC, Tekla Structures
The Challenge
- The project experienced late-stage design changes during construction.
- Risk of information gaps between construction completion and operational handover.
- Need for continuity between coordination models and final record BIM.
- The client required a reliable, operational-ready record model at closeout.
Our BIM Approach
- Provided design-assist BIM support to manage and absorb late design changes.
- Maintained coordinated LOD 350–400 BIM models through construction.
- Implemented a staged handover strategy to progressively validate model accuracy.
- Applied package-level clash KPIs to maintain coordination discipline.
- Produced commissioning-focused views and a clean record model for handover.
Results & Impact
- Faster closeout through controlled, staged BIM handover.
- Reduced rework and information gaps at the end of construction.
- Improved confidence in record model accuracy.
- Smoother transition from construction into operations.
Value Delivered
- Acted as a BIM continuity partner from construction through closeout.
- Reduced closeout risk through structured record BIM delivery.
- Delivered asset-ready information supporting long-term operations.
- Demonstrated strong expertise in late-stage BIM management for data centers.