BIM Coordination > Commercial Build > Ireland

Project Snapshot

Project type: Commercial development

Location: Ireland

Client type: Consultant

Project phase: Design + Construction

BIM services: Multidisciplinary BIM authoring, model federation, coordination, drawing extraction, IFC delivery

Disciplines: Architecture, Structure, MEPF

The Challenge

  1. The client required a fully coordinated BIM model before site mobilization to reduce uncertainty during construction.
  2. The project was delivered on a fast-track program, leaving little tolerance for design conflicts or late coordination.
  3. Multiple consultants and stakeholders were contributing design inputs in parallel, increasing coordination risk.

Our BIM Approach

  1. We established an ISO 19650–compliant BIM execution framework, including BEP, CDE setup, and clear modelling standards.
  2. All disciplines were federated into a single coordination model, developed to LOD 300–350 to support construction readiness.
  3. Coordination efforts were prioritized around high-risk zones such as risers and plantrooms.
  4. Weekly coordination cycles and structured clash reports ensured timely issue resolution and alignment across teams.

Results & Impact

  1. More than 1,200 clashes were identified and resolved before construction commenced.
  2. Early coordination contributed to an estimated 20% reduction in RFIs.
  3. Site teams received coordinated models and drawings, reducing ambiguity and rework risk.

Value Delivered

  1. Acted as an end-to-end BIM coordination partner, bridging design and construction.
  2. Enabled predictable delivery on a compressed program through early risk removal.
  3. Provided the client with confidence to proceed to site with coordinated information.

More posts