Project Snapshot
Project type: Commercial development
Location: Ireland
Client type: Consultant
Project phase: Design + Construction
BIM services: Multidisciplinary BIM authoring, model federation, coordination, drawing extraction, IFC delivery
Disciplines: Architecture, Structure, MEPF
The Challenge
- The client required a fully coordinated BIM model before site mobilization to reduce uncertainty during construction.
- The project was delivered on a fast-track program, leaving little tolerance for design conflicts or late coordination.
- Multiple consultants and stakeholders were contributing design inputs in parallel, increasing coordination risk.
Our BIM Approach
- We established an ISO 19650–compliant BIM execution framework, including BEP, CDE setup, and clear modelling standards.
- All disciplines were federated into a single coordination model, developed to LOD 300–350 to support construction readiness.
- Coordination efforts were prioritized around high-risk zones such as risers and plantrooms.
- Weekly coordination cycles and structured clash reports ensured timely issue resolution and alignment across teams.
Results & Impact
- More than 1,200 clashes were identified and resolved before construction commenced.
- Early coordination contributed to an estimated 20% reduction in RFIs.
- Site teams received coordinated models and drawings, reducing ambiguity and rework risk.
Value Delivered
- Acted as an end-to-end BIM coordination partner, bridging design and construction.
- Enabled predictable delivery on a compressed program through early risk removal.
- Provided the client with confidence to proceed to site with coordinated information.